Project Limits: The project is located along the SR 1 corridor in Kent County, south of the town of Frederica. The approximate limits are 2600 feet north of the SR 1 and Frederica Road intersection to 1850 feet south of the SR 1 and Milford Neck Road\Tub Mill Pond Road intersection. The eastern boundary extends approximately 2300 feet along Milford Neck Road. The western boundary extends approximately 2400 feet along Tub Mill Pond Road. Project Overview: The intersection of SR 1 and Frederica Road (Route12) was identified as a potential grade separated intersection location through the Corridor Capacity Preservation Program. The existing at grade intersection at Frederica Road will be removed and access to SR 1 will be provided via ramps. Frederica Road will be extended south to the intersection of Church Hill Road and Tub Mill Pond Road. A total of five conceptual alternatives have been developed and where shown to the public at a workshop on May 12, 2008. Current Project Schedule: The project began in September 2007. Five alternatives were developed and presented to the public at a workshop on May 12, 2008. Based on input from the public, natural and cultural resources agencies, and emergency response units, a preferred alternative will be selected and presented to the public at a workshop scheduled for August 20, 2008. The environmental investigation and documentation process is currently on-going. The final design phase will begin in the fall of 2008. Current Construction Schedule: Construction could begin as early as 2012. |
|